Sourcing
How much to order: production volume for a new brand
Turning sell-through assumptions into a first order, a reorder point and a safety stock you can defend.

Translate selling assumptions into sets
Start with expected weekly sales per design and the number of weeks you want to cover. Count saleable inventory separately from creator mailers, samples and replacements. The example below is a planning exercise, not an Orla minimum or a market forecast.
| Design | Expected weekly units | Eight weeks of sales |
|---|---|---|
| French tip | 32 | 256 |
| Cat eye | 20 | 160 |
| Glaze | 12 | 96 |
The base case requires 512 saleable sets. Add 24 marketing sets and 16 replacement sets: 552 to allocate. If demand comes in 25% below forecast, the sales requirement is 384 and the same order leaves 128 extra saleable sets. Test that cash exposure before specifying individual printed boxes.
Calculate the next release independently
At 64 sets per week, seven weeks of replenishment plus two weeks of buffer gives a reorder trigger of 576 sets. This is inventory position, including reliable inbound stock and subtracting commitments, not a suggested minimum opening order. With an opening run below that trigger, discuss the second release before launching the first.
Track which units can actually sell
For a receipt of 600 sets, 18 quarantined kits leave 582 saleable: a 97% initial release rate. Record what caused the hold, and whether rework can recover the kits. Inspection is one input to the release decision. NIST describes how acceptance sampling links a sample result to a lot decision.
What to put in the quote brief
List quantity per design, base shape, kit contents, printed materials, expected reorder date and the maximum cash available for packaging. Ask for the price breaks the supplier can actually support. A discount on more boxes does not reduce the cash tied up in unsold designs.
Check the order at the SKU level
The arithmetic for a whole launch can disguise the first stockout. Consider a store with 160 sets on hand in each of two finishes. Both have the same supplier lead time, but sales rates differ.
| Checkpoint | Calculation or evidence | Buying decision |
|---|---|---|
| Fast finish | 32 sales per week exhaust 160 sets in five weeks. | With seven weeks until replenishment the planned gap is 64 sets unless another receipt intervenes. |
| Slow finish | 12 sales per week give over 13 weeks of cover. | Avoid ordering it just because the fast finish needs replenishment. |
| Cash exposure | A proposed extra 100 sets per finish at an assumed $2.50 each ties up $500 before freight. | Ask whether the $250 allocated to the slow finish would earn more as a later reorder. |
Write the trigger against the SKU and compare it weekly with confirmed inbound dates. If a retailer changes the ordered pack count, recheck the identification rules for the changed retail item before counting the old and new packs as interchangeable. Show management the downside sell-through and the cash committed to packaging as separate lines.